A power distribution problem is indicated. Go to
obtain event codes. If no event codes are found, go to
0100: power distribution analysis
A faulty PWR LED is indicated, but Fibre Channel port operation is
not disrupted.
a. If continued operation without benefit of the PWR LED is
acceptable to the customer, do not perform any repair action.
b. If continued operation without benefit of the PWR LED is not
acceptable to the customer, remove and replace the switch.
Exit MAP.
30
Is the ERR LED blinking?
YES
NO
Go to
step
32.
31
Unit beaconing is enabled for the switch.
a. Consult the customer and next level of support to determine the
reason unit beaconing is enabled.
b. Disable unit beaconing.
1. At the Hardware View, right-click the front bezel graphic
(away from a FRU). A pop-up menu appears.
2. Click Enable Unit Beaconing. The check mark disappears
from the box adjacent to the option, and unit beaconing is
disabled.
Was unit beaconing enabled because an switch failure or degradation
was suspected?
YES
NO
The switch appears operational.
Go to
step
25.
32
Is the ERR LED illuminated?
YES
NO
The switch appears operational. Verify operation at the EFC
Server. Go to
step
on page 204.
3.
Chapter 3: Diagnostics
step 23
to
MAP
197