Figure 5-16 Installing The Screws - Silicon Graphics OCTANE2 Owner's Manual

Hide thumbs Also See for OCTANE2:
Table of Contents

Advertisement

Chapter 5: Installing and Removing XIO Boards
122
3. Place the option board or blank panel on the standoffs.
Some option boards must be placed in designated slots. Always check your option
board installation manual for information about board placement or other pertinent
information.
4. Install the screws, tightening the board or panel to the standoffs, as shown in
Figure 5-16.
Make sure all the slots are filled, with the VPro graphics board, and either an
Note:
option board, or blank panel. The system does not cool properly if any of the slots are
empty.
Figure 5-16
Installing the Screws