15.9.5 Concluding steps
Perform the following procedures to complete the task:
Ê Close the server cover as described in section
page
70.
Ê Reconnect the AC power cord to the power supply unit and secure it with a
cable tie as described in section
page
73.
Ê If applicable, update the firmware of the RAID controller that has been
connected to the BBU as described in section
firmware" on page
Ê Enable boot watchdog functionality as described in section
boot watchdog functionality" on page
TX120 S3
"Connecting the server to the mains" on
91.
Upgrade and Maintenance Manual
"Closing the server" on
"Updating RAID controller
96.
Cables
"Enabling SVOM
421