Swapping The Processor - Fujitsu PRIMERGY TX120 S3 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY TX120 S3:
Table of Contents

Advertisement

System board and components

14.4.4.2 Swapping the processor

Figure 214: Unlatching the socket lever (new system board)
Ê Unlatch the socket lever on the new system board by pushing it down and
away from the socket (1).
Ê Fold back the socket release lever to disengage the load plate.
354
Upgrade and Maintenance Manual
TX120 S3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents