Hard disk drives / solid state drives
7.3.3.4

Concluding steps

Perform the following procedures to complete the task:
Ê Close the front cage as described in section
page
68.
Ê Close the server cover as described in section
on page
72.
7.3.4

Replacing a 3.5-inch HDD module

Upgrade and Repair Units (URU)
Average task duration: 10 minutes
V
CAUTION!
Only remove an HDD module during operation if the drive is not
currently being accessed. Observe the indicators for the
corresponding HDD modules, see "PRIMERGY TX120 S3 Server
Operating Manual".
Under no circumstances should you remove an HDD module while
the system is in operation if you are not sure that the drive is operated
by a RAID controller and belongs to a disk array that is operating in
RAID level 1, 1E, 10, 5, 50, 6 or 60.
An HDD module can only be replaced during operation in conjunction
with a corresponding RAID configuration.
All HDD modules (drives) must be uniquely identified so that they can
be reinstalled in their original mounting locations later. If this is not
done, existing data can be lost.
7.3.4.1

Required tools

Preliminary and concluding steps: tool-less
Replacing a 3.5-inch HDD module: tool-less
140
Upgrade and Maintenance Manual
"Closing the front cage" on
"Mounting the server cover"
TX120 S3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents