14.2.1.5 Software configuration

The UFM delivery set includes the "Recovery Tool CD" to setup the VMware
ESXi configuration. Proceed as follows:
Ê Switch on the server.
Ê Right after switching on the server, insert the "Recovery Tool CD" into the
DVD drive and close the drive tray.
Ê The server should now boot from the "Recovery Tool CD".
Ê Follow the on-screen instructions.

14.2.2 Removing the UFM board

Field Replaceable Units (FRU)
Average task duration: 5 minutes

14.2.2.1 Required tools

Preliminary and concluding steps:
– Phillips PH2 / (+) No. 2 screw driver
Removing the UFM:
– Phillips PH1 / (+) No. 1 screw driver

14.2.2.2 Preliminary steps

Before removing the UFM board, perform the following steps:
Ê Disable BitLocker functionality as described in section
functionality" on page
Ê Locate the defective server as described in section
server" on page
Ê Shut down the server as described in section
page
58.
Ê Disconnect the AC power cord from the system.
322
79.
50.
Upgrade and Maintenance Manual
"Disabling BitLocker
"Locating the defective
"Shutting down the server" on
TX120 S3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents