Required Tools; Preliminary Steps - Fujitsu PRIMERGY TX120 S3 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY TX120 S3:
Table of Contents

Advertisement

11.2.1 Required tools

Preliminary and concluding steps: tool-less
Removing and installing the processor heat sink:
– Phillips PH2 / (+) No. 2 screw driver
Removing and installing the processor: tool-less

11.2.2 Preliminary steps

Before upgrading or replacing the processor, perform the following steps:
Ê Disable BitLocker functionality as described in section
functionality" on page
Ê Disable boot watchdog functionality as described in section
SVOM boot watchdog functionality" on page
Ê Locate the defective server as described in section
server" on page
Ê Shut down the server as described in section
page
58.
Ê Disconnect the AC power cord from the system.
Ê Remove the server cover as described in section
page
61.
TX120 S3
79.
50.
Upgrade and Maintenance Manual
"Disabling BitLocker
"Disabling
80.
"Locating the defective
"Shutting down the server" on
"Opening the server" on
Processors
247