Preparing The Bbu - Fujitsu PRIMERGY TX120 S3 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY TX120 S3:
Table of Contents

Advertisement

Ê Open the front cage as described in section
page
66.
9.3.1.3

Preparing the BBU

I
The PRIMERGY TX120 S3 can be equipped with one iBBU7 or one
iBB8.The preparation for installing is described in the following two
sections.
iBBU7
Figure 85: Connecting the BBU cable
Ê Connect the BBU cable Y3987-V3 to the BBU board as shown.
I
The connector side with uncoated contacts points towards the board.
TX120 S3
Upgrade and Maintenance Manual
Expansion cards and backup units
"Opening the front cage" on
189

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents