Concluding Steps - Fujitsu PRIMERGY TX120 S3 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY TX120 S3:
Table of Contents

Advertisement

13.1.5 Concluding steps

Perform the following procedures to complete the task:
Ê Close the front cage as described in section
page
68.
Ê Close the server cover as described in section
page
70.
Ê Reconnect the AC power cord to the power supply unit.
Ê Verify whether a backup copy of the system board settings has been
successfully transfered to the Chassis ID EPROM as described in section
"Verifying system information backup / restore" on page
Ê Store your server's system information on the Chassis ID EPROM
integrated into the front panel board. For further information on how to obtain
and use the ChassisId_Prom Tool, refer to section
Prom Tool" on page
Ê Enable boot watchdog functionality as described in section
boot watchdog functionality" on page
Ê If BitLocker functionality is used and has been disabled before starting the
maintenance task, re-enable BitLocker as described in section
BitLocker functionality" on page
TX120 S3
106.
103.
Upgrade and Maintenance Manual
Front panel and LAN connector
"Closing the front cage" on
"Closing the server" on
"Using the Chassis ID
96.
90.
"Enabling SVOM
"Enabling
299

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents