Expansion cards and backup units
for the Japanese market:
http://jp.fujitsu.com/platform/server/primergy/system/
9.2
Expansion cards
9.2.1
Installing expansion cards
Upgrade and Repair Units (URU)
Average hardware task duration: 5 minutes
Average software task duration: 5 minutes
9.2.1.1
Required tools
Preliminary and concluding steps: tool-less
●
Installing expansion cards: tool-less
●
9.2.1.2
Preliminary steps
Before installing an expansion card, perform the following steps:
Ê Disable BitLocker functionality as described in section
functionality" on page
Ê Disable boot watchdog functionality as described in section
SVOM boot watchdog functionality" on page
Ê If applicable, verify existing LAN teaming configurations as described in
section
"Configuring LAN teaming" on page
Ê Shut down the server as described in section
page
58.
Ê Disconnect the AC power cord from the system.
Ê Remove the server cover as described in section
page
61.
176
79.
Upgrade and Maintenance Manual
"Disabling BitLocker
"Disabling
80.
83.
"Shutting down the server" on
"Opening the server" on
TX120 S3