Concluding Steps - Fujitsu PRIMERGY TX120 S3 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY TX120 S3:
Table of Contents

Advertisement

Front panel and LAN connector

13.2.3.5 Concluding steps

Perform the following procedures to complete the task:
Ê Close the front cage as described in section
page
68.
Ê Close the server cover as described in section
page
70.
Ê Reconnect the AC power cord to the power supply unit.
Ê Inform the customer about changed WWN and MAC addresses. For further
information, refer to section
on page
104.
Ê After replacing the front LAN board in a server running Linux OS, update its
MAC address in the related NIC definition file as described in section
"Updating the NIC configuration file in a Linux environment" on page
Ê If applicable, restore LAN teaming configurations as described in section
"After replacing / upgrading LAN controllers" on page
Ê If BitLocker functionality is used and has been disabled before starting the
maintenance task, re-enable BitLocker as described in section
BitLocker functionality" on page
312
"Looking up changed MAC / WWN addresses"
103.
Upgrade and Maintenance Manual
"Closing the front cage" on
"Closing the server" on
107.
101.
"Enabling
TX120 S3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents