Concluding Steps; Replacing Memory Modules; Required Tools - Fujitsu PRIMERGY TX120 S3 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY TX120 S3:
Table of Contents

Advertisement

10.3.4 Concluding steps

Perform the following procedures to complete the task:
Ê Close the server cover as described in section
page
70.
Ê Reconnect the AC power cord to the power supply unit.
Ê Enable boot watchdog functionality as described in section
boot watchdog functionality" on page
Ê If BitLocker functionality is used and has been disabled before starting the
maintenance task, re-enable BitLocker as described in section
BitLocker functionality" on page
10.4

Replacing memory modules

Upgrade and Repair Units (URU)
Average task duration: 5 minutes

10.4.1 Required tools

Preliminary and concluding steps: tool-less
Replacing memory modules: tool-less
TX120 S3
103.
Upgrade and Maintenance Manual
"Closing the server" on
96.
Main memory
"Enabling SVOM
"Enabling
241

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents