Front panel and LAN connector
13.2.2.4 Concluding steps
Perform the following procedures to complete the task:
Ê Close the front cage as described in section
page
68.
Ê Close the server cover as described in section
page
70.
Ê Reconnect the AC power cord to the power supply unit.
Ê If BitLocker functionality is used and has been disabled before starting the
maintenance task, re-enable BitLocker as described in section
BitLocker functionality" on page
310
103.
Upgrade and Maintenance Manual
"Closing the front cage" on
"Closing the server" on
"Enabling
TX120 S3