Concluding Steps - Fujitsu PRIMERGY TX120 S3 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY TX120 S3:
Table of Contents

Advertisement

Figure 191: Installing the UFM board
Ê Connect the UFM board to the system board, snapping in the UFM spacer.

14.2.1.4 Concluding steps

Perform the following procedures to complete the task:
Ê Close the server cover as described in section
page
70.
Ê Reconnect the AC power cord to the power supply unit.
Ê Enable boot watchdog functionality as described in section
boot watchdog functionality" on page
Ê If BitLocker functionality is used and has been disabled before starting the
maintenance task, re-enable BitLocker as described in section
BitLocker functionality" on page
TX120 S3
103.
Upgrade and Maintenance Manual
System board and components
"Closing the server" on
96.
"Enabling SVOM
"Enabling
321

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents