7-26. Reel Drive Gear Assembly Replacement
Replacement (Perform the part replacement according to the following
procedure.)
Removing the FG magnet cover
Removing the timing belt
Removing the reel drive gear assembly
Installing the reel drive gear assembly
Installing the timing belt
Installing the FG magnet cover
Adjustments after replacement
Timing belt tension adjustment
Capstan add-on recording adjustment
Preparations
1. Turn off the main power.
2. Remove the front lid and outside panel assembly. (Refer to Section 1-4.)
3. Open the inside panel assembly. (Refer to Section 1-5.)
4. Removing the plug-in boards (Refer to Section 1-7.)
5. Remove the cassette compartment. (Refer to Section 1-9.)
6. Removing the SS-92G board (Refer to Section 6-20.)
n
Reel drive gear assembly replacement can be performed in the state that mechanical
deck assembly is being installed in the unit.
Tools
. Torque screwdriver bit (for M1.4) : J-6325-110-A
. Torque screwdriver bit (for M2) :
. Torque screwdriver (for 3 kg) :
HDW-F900R/V1 (E)
J-6325-380-A
J-6325-400-A
7-87