2.2.6 Install the FlexMT to the machine

If the wholes are drilled prior to putting the FlexMT into position use the following
drilling plan. Pay attention to distances implied by extension panel options.:
FlexMT drilling template (in mm), seen from above (1)
3HAC051768-001 Revision: -
Note
The fastenening elements are not part of the delivery as they must be selected
with reference to the floor material. Use only suitable fastening elements. Pay
attention to the expected loads.
CAUTION
The conveyor must be levelled both in the direction of movement and across it
within < 5 mm/m ( < 1 mm/m for rolling parts). Each deviation must be corrected.