Toro ProLine H800 Service Manual page 113

Hide thumbs Also See for ProLine H800:
Table of Contents

Advertisement

Test Procedure
ProLine H800
19241SL Rev A
1. Once the test equipment is properly connected, you can run the engine and
pump to warm the hydraulic fluid to operating temperature.
Any test procedure that requires an open or uncapped line (like a case drain
leak check) would not apply. In those rare situations, the hydraulic fluid
should be warmed before disconnecting the lines.
Before opening the hydraulic system, operate all the hydraulic
controls to release system pressure and avoid injury from the
pressurized hydraulic fluid; refer to
Hydraulic System (page
2. Park the machine on a level surface, lower the cutting deck, shut off the
engine, and set the parking brake.
3. Read all Warning, Cautions, and precautions listed at the beginning of this
section.
4. Access the hydraulic pump from right side as below:
g215339
1.
Handle
A. Push the latch (item 2) inward toward the radiator
B. Using the handle (item 1), rotate the radiator to access the hydraulic
pump
(Figure
52).
CAUTION
Releasing Pressure from the
5–5).
Figure 52
2.
Latch
Page 5–45
Hydraulic System: Testing the Hydraulic System
(Figure
52).

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

3105031050te

Table of Contents