Analog Point-To-Point Wiring; Digital Field Bus And Hart Wiring - ABB STT04 Instruction Manual

Smart transmitter terminal
Table of Contents

Advertisement

To install the clip leads cable:
1. Insert the female end of the clip leads cable connector into the
clip leads cable receptacle on the terminal with the button facing up
(Fig. 3-1). Make sure the connector is fully engaged.
2. Connect the clip leads to the signal wires between the device and
the 250 ohm resistance. The clip leads connect across the signal
leads independent of signal direction or polarity. Refer to Figures
and 3-3.
To remove the clip leads cable:
1. Fully depress and hold in the button on the top of the clip leads
cable connector.
2. Firmly, but carefully pull the connector from the receptacle.
+
S Y S T E M P O W E R
S U P P LY
C O M M U N IC AT IO N S A R E
N O T P O S S IB L E O N T H IS
S ID E O F 250-
R E S IS TO R
Figure 3-2. Analog Point-to-Point Wiring
S IG N A L W IR E S
+
P W R /
O U T P U T
F IE L D D E V IC E 1
Figure 3-3. Digital Field Bus and HART Wiring
S IG N A L W IR E S
250 Ω
+
C O N T R O L LE R ,
R E C O R D E R O R
C O N T R O L S Y S T E M
C O M M U N IC AT IO N S A R E
P O S S IB L E O N T H IS S ID E
O F 250-
R E S IS TO R
U P TO 1 M I. (1.6 K M )
T E R M IN AT IO N
U N IT
S T T
INSTALLATION
+
F IE L D D E V IC E
S T T
F IE L D B U S
I/O M O D U L E
+
P W R /
O U T P U T
F IE L D D E V IC E 8
SETUP AND PHYSICAL INSTALLATION
3-2
P W R /
O U T P U T
T 013 23B
M F P /M F C
T 01 324B
3 - 3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents