Section 3 - Installation; Introduction; Unpacking And Inspection; Setup And Physical Installation - ABB STT04 Instruction Manual

Smart transmitter terminal
Table of Contents

Advertisement

INTRODUCTION

UNPACKING AND INSPECTION

SETUP AND PHYSICAL INSTALLATION

SECTION 3 - INSTALLATION

This section provides procedures that make the STT04 terminal oper-
ational.
Before unpacking, carefully examine the exterior of the shipping con-
tainer for evidence of in-transit damage. Inspect for punctures, tears
or other damage that penetrates the outer container, and for evidence
of water damage.
The shipping package contains the following:
STT04 Smart Transmitter Terminal.
Clip leads cable.
DownLink Software CD (STT04 firmware or later).
STT04 carrying case (optional).
NOTE: If STT04 firmware is A.0, DownLink Software is not included
with the firmware. Contact the nearest ABB sales office for software
availability.
Examine the exterior of the STT04 terminal for physical defects.
If storing the terminal prior to operation, pack in the original container,
if possible. Store in an area free of extremes in temperature and
humidity.
The only installation task is the connection of the provided clip leads.
Otherwise, the STT04 terminal comes fully assembled and opera-
tional.
INTRODUCTION
3 - 1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents