Keysight E5071C ENA Network Analyzers
Service Guide
7
Post-Repair Procedures
This chapter lists the procedures required to verify the E5071C operation after
an assembly is replaced with a new one.
Post-Repair Procedures
Table 7-1
performed after the replacement of an assembly or CPU. These are the
recommended minimum procedures to ensure that the replacement is
successfully completed.
It is recommended to confirm the performance executing with all of
adjustment and performance tests as final step.
Post Repair Procedures lists the required procedures that must be
283