Replacement Procedure
Handler I/O Board Replacement (A23)
Handler I/O Board Replacement (A23)
Tools Required
•
Removal Procedure
Refer to
Step 1. Remove the outer cover as described in
Step 2. Disconnect the flat cable (item 1) from the handler I/O board.
Step 3. Remove the two TORX T10 screws (item 2) fastening the handler I/O board.
Step 4. Slide the handler I/O board toward backward (item 3).
222
TORX screwdriver, T10, T15, and T20
Figure 6-15
for this procedure.
"Outer Cover Removal" on page
Keysight E5071C ENA Network Analyzers
203.