Signal analyzer external mixing upgrade kit (23 pages)
Summary of Contents for Keysight E5080A
Page 1
Keysight E5080A ENA Series Network Analyzer Installation Guide...
Page 3
52.227-19 (June 1987) or any equiva- procedure, practice, or condition lent agency regulation or contract that is essential for the user to clause. Use, duplication or disclosure understand. of Software is subject to Keysight Technologies’ standard commercial license terms, and non-DOD Depart-...
Page 4
When you notice any of the unusual conditions listed below, immediately terminate operation and disconnect the power cable. Contact your local Keysight Technologies sales representative or authorized service company for repair of the instrument. If you continue to operate without repairing the instrument, there is a potential fire or shock hazard to the operator.
Page 5
• The Low Voltage Directive 2006/95/EC • The EMC Directive 2004/108/EEC To obtain Declaration of Conformity, please contact your local Keysight Technologies sales office, agent or distributor. Safety Notice Supplement • This equipment complies with EN/IEC61010-1:2010. • This equipment is of MEASUREMENT CATEGORY I (CAT I). Do not use for CAT II, III, or IV.
Page 6
The E5080A complies with INSTALLATION CATEGORY II as well as NOTE POLLUTION DEGREE 2 in IEC61010-1. The E5080A is an INDOOR USE product. The LEDs in the E5080A are Class 1 in accordance with NOTE IEC60825-1, CLASS 1 LED PRODUCT.
Page 7
To avoid the danger of introducing additional hazards, do not install substitute parts or perform unauthorized modifications to the instrument. Return the instrument to a Keysight Technologies Sales and Services Office for service and repair to ensure that safety features are maintained in operational condition.
Page 8
Should Keysight and the user have a separate written agreement with warranty terms covering the material in this document that conflict with these terms, the warranty terms in the separate agreement will control.
Page 9
The installation guide (this manual) provides start up setup information when you use the E5080A for the first time and troubleshooting information when the Windows cannot be boot up. See this manual first when you use the E5080A for the first time. Online Help The online help provides the information about the quick start, measurement operation, programming, and I/O interface.
Page 10
The following shows the contents of this manual. Chapter 1, "Installation" This chapter provides information about how to set up the Keysight E5080A. Chapter 2, "Troubleshooting" This chapter describes the troubleshooting during start up and the procedure of the operating system (OS) recovery when the Windows OS has been damaged.
Verification and Connection of Power Cable Blown Fuses Starting the E5080A Turning the Power ON and OFF Disconnection from Supply Source Initial Registration of E5080A Troubleshooting Troubleshooting during Startup System Recovery Notes on executing the factory recovery function Procedure to execute the factory recovery...
Page 13
Keysight E5080A Network Analyzer Installation Guide Installation Checking the Shipment Environmental Requirements Power Supply Blown Fuses Starting the E5080A Initial Registration of E5080A This chapter provides information about how to set up the Keysight E5080A.
A fault has been detected in the subsequent operation check of the analyzer. If an abnormality is detected in step 1, contact the company that transported the analyzer as well as your nearest Keysight Technologies sales and service office. Network Analyzer...
Installation Environmental Requirements Set up the E5080A where the following environmental requirements are met. Operating Environments Ensure that the operating environment meets the following requirements. Temperature 0 °C to 40 °C Temperature range at 23 °C ± 3 °C (< 1 °C deviation from the temperature...
As described in “Disconnection from Supply Source” on page 18, the power supply is disconnected by removing the power cable’s connector plug from either the AC outlet or the E5080A unit. When installing the E5080A, ensure that there is sufficient free space around the unit to permit quick disconnection of the plug (from AC outlet or E5080A unit) in case of emergency.
300 VA consumption Verification and Connection of Power Cable The three-wire power cable attached to the E5080A has one wire serving as the ground. Using this power cable allows the E5080A to be grounded, thereby protecting you against any potential electrical shock from the power outlet.
Keysight Technologies Customer contact center listed at the end of this guide. The E5080A uses the following fuse types: UL/CSA Type, Slow-Blo, 10 A-250 Vac. DO NOT replace the fuse yoursel f as doing this may expose WA R N I N G yoursel f to electrical shock.
Installation Starting the E5080A This section describes how to turn ON/OFF the E5080A power and how to cut off the power supply in the case of emergency. Turning the Power ON and OFF The standby switch can turn ON/OFF the E5080A. The color on...
Disconnection from Supply Source The power supply of the E5080A is cut off by disconnecting the plug of the power cable (on either AC outlet side or E5080A side). When it is necessary to disconnect the power supply in order to avoid shock hazards, etc., pull out the power cable plug from...
Page 21
Installation To allow this operation to be performed smoothly, be sure to N O T E follow the guidelines in “Ensuring Adequate Free Space around Analyzer for Immediate Disconnection of Power Cable in Case of Emergency” on page 14. When turning the power OFF under normal circumstances, always follow the methods described in “Turning the Power OFF”...
Installation Initial Registration of E5080A When you start up the E5080A for the first time, you need to perform the initial registration of the Windows operating system of the E5080A. When the Windows agreement message box appears, click Agree. The rest of the procedure runs automatically.
Keysight E5080A Network Analyzer Installation Guide Troubleshooting Troubleshooting during Startup System Recovery This chapter describes the troubleshooting process during start up and the procedure of the operating system (OS) recovery when the Windows OS has been damaged.
Page 24
Troubleshooting Troubleshooting d uring Startup When you encounter problems during start up, see Table System recovery saves most of problems. Table 1 Troubleshooting during startup Symptom Solution Turning ON (|) the standby switch does not Confirm that the power cable is start up the system.
Notes on executing the factory recovery function Executing the factory recovery function causes the following conditions: • In addition to the Windows operating system and the firmware, the following settings of the E5080A are returned to the factory state. • Network setting •...
Page 26
Step 3. Connect the keyboard to the E5080A. Step 4. Press the standby switch of the E5080A to turn it ON. Step 5. When the screen as shown in the figure below appears, select Instrument Image Recovery System and press [Enter].
Page 27
Troubleshooting Step 6. Type 2 to select Recover the original factory system image option and press [Enter]. Figure 4 System recovery selection screen Step 7. A confirmation message appears. Click OK to continue the process. Figure 5 System recovery confirmation screen Step 8.
Page 28
“Initial Registration of E5080A” on page 20. Never turn OFF the power during the system recovery C A U T I O N because doing so may cause serious damage to the E5080A. Network Analyzer...
Page 29
Index assistance, documentation warranty, environmental requirements operating environments, ventilation requirement, error-correction temperature range, exclusive remedies, inspection checking the shipment, manual contents, power disconnection from supply source, power cable options, verification and connection of power cable, verification of the power supply, safety symbols, shutdown...