Adjustment; Safety Considerations; Warm-Up For Adjustment; Required Equipment - Keysight E5071C ENA Service Manual

Network analyzers
Hide thumbs Also See for E5071C ENA:
Table of Contents

Advertisement

Keysight E5071C ENA Network Analyzers
Service Guide
3

Adjustment

This chapter provides the adjustment information for the E5071C ENA Series
Network Analyzer to ensure that it is within its specifications. The adjustment
must be performed Keysight's qualified service personnel. If you need the
adjustment for your E5071C, it should be sent to the nearest Keysight
Technologies service office.

Safety Considerations

This manual contains NOTEs, CAUTIONs, and WARNINGs that must be
followed to ensure the safety of the operator and to keep the instrument in a
safe and serviceable condition. The adjustment must be performed by
Keysight's qualified service personnel.
Any interruption of the protective ground conductor (inside or outside the
equipment) or disconnection of the protective ground terminal can make
the instrument dangerous. Intentional interruption of the protective
ground system for any reason is prohibited.

Warm-up for Adjustment

Warm-up the E5071C for at least 90 minutes before performing any of the
following adjustment procedures to ensure proper results and correct
instrument operation.

Required Equipment

Table 1-2 on page 24
procedures described in this chapter. Use only calibrated test equipment when
adjusting the E5071C.
lists the equipment required to perform the adjustment
57

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents