Keysight E5063A Installation Manual

Network analyzer
Hide thumbs Also See for E5063A:

Advertisement

Keysight E5063A
Network Analyzer
Installation Guide

Advertisement

Table of Contents
loading

Summary of Contents for Keysight E5063A

  • Page 1 Keysight E5063A Network Analyzer Installation Guide...
  • Page 2: Safety Notices

    EULA. governed by United States and Declaration of Conformity Keysight shall be under no obligation international copyright laws. to update, revise or otherwise modify Trademark Acknowledgments Declarations of Conformity for this the Software.
  • Page 3: Safety Summary

    When you notice any of the unusual conditions listed below, immediately terminate operation and disconnect the power cable. Contact your local Keysight Technologies sales representative or authorized service company for repair of the instrument. If you continue to operate without repairing the instrument, there is a potential fire or shock hazard to the operator.
  • Page 4 European Directives, and carries the CE marking accordingly: • The Low Voltage Directive 2006/95/EC • The EMC Directive 2004/108/EEC To obtain Declaration of Conformity, please contact your local Keysight Technologies sales office, agent or distributor. Keysight E5063A Network Analyzer...
  • Page 5 • This equipment is tested in stand-alone condition and in combination with the accessories supplied by Keysight Technologies against the requirement of the standards described in the Declaration of Conformity. If it is used as a system component, compliance of related regulations and safety requirements are to be confirmed by the builder of the system.
  • Page 6: General Safety Precautions

    To avoid the danger of introducing additional hazards, do not install substitute parts or perform unauthorized modifications to the instrument. Return the instrument to a Keysight Technologies Sales and Service Office for service and repair to ensure that safety features are maintained in operational condition.
  • Page 7 Warnings, such as the example below, precede potentially dangerous procedures throughout this manual. Instructions contained in the warnings must be followed. Dangerous voltage levels, capable of causing death, are present in this instrument. Use extreme caution when handling, testing, and adjusting this instrument. Keysight E5063A Network Analyzer...
  • Page 8: Safety Symbols

    Alternating current. Direct current. On (Supply). Off (Supply). A chassis terminal; a connection to the instrument’s chassis, which includes all exposed metal structure. Standby. Keysight E5063A Network Analyzer...
  • Page 9 Keysight shall not be liable for errors or for incidental or consequential damages in connection with the furnishing, use, or performance of this document or any information contained herein.
  • Page 10 The online help provides the information about the quick start, measurement operation, programming, built-in VBA, I/O interface This is pre-installed in the E5063A. Press [Help] hard key on the front panel to open. Quick Start helps in understanding the E5063A operation quickly.
  • Page 11 Manuals for E5061B sensitive help, users can receive information quickly about the area the user is working in the firmware of the E5063A. It provides information relevant to the task that needs to be accomplished and reduces the time to search relevant information required to complete a task.
  • Page 12 Caution Manuals for E5061B Keysight E5063A Network Analyzer...
  • Page 13: Table Of Contents

    Initial Registration of E5063A........
  • Page 14 Contents Keysight 16190B Operation and Service Manual...
  • Page 15: Installation

    Keysight E5063A Network Analyzer Installation Guide Installation This chapter provides information about how to set up the Keysight E5063A.
  • Page 16: Checking The Shipment

    Step 3. By referring to the furnished contents list, check that all packaged items supplied with the analyzer have been received as per the specified options. Step 4. After checking, if one of the following applies, contact your nearest Keysight Technologies sales and service office.
  • Page 17: Environmental Requirements

    Installation Environmental Requirements Environmental Requirements Set up the E5063A where the following environmental requirements are met. Operating Environments Ensure that the operating environment meets the following requirements. Temperature 5°C to 40°C Temperature range at 23°C ± 5°C (<1°C deviation from the temperature when...
  • Page 18: Protection Against Electrostatic Discharge (Esd)

    24, the power supply is disconnected by removing the power cable’s connector plug from either the AC outlet or the E5063A unit. When installing the E5063A, ensure that there is sufficient free space around the unit to permit quick disconnection of the plug (from AC outlet or E5063A unit) in case of emergency.
  • Page 19: Installing Front Handles/Rack Mounting Flanges

    Installing Front Handles/Rack Mounting Flanges Installing Front Handles/Rack Mounting Flanges The E5063A can be installed on a workbench or in a rack. This section describes how to install the front handles (Option 1CN) used for moving or transporting the instrument, and how to install the analyzer in an equipment rack as part of a measurement system (Option 1CM: without the handles, Option 1CP: with the handles).
  • Page 20 Step 3. (Option 1CM/Option 1CP). Remove the four bottom feet of the E5063A (lift the bar marked TAB on the inner side of the foot and slide the foot towards the bar).
  • Page 21: Power Supply

    *. Switched automatically by the E5063A in conformity to the voltage used. Verification and Connection of Power Cable The three-wire power cable attached to the E5063A has one wire serving as a ground. Using this power cable allows the E5063A to be grounded, thereby protecting you against electrical shock from the power outlet.
  • Page 22: Blown Fuses

    Blown Fuses If the fuse appears to have blown during operation, this instrument may be subject to failure and must be repaired. For any assistance, contact Keysight Technologies Customer contact center listed at the end of this guide. The product uses the following fuse types: UL/CSA Type, Slow-Blo, 10 A-250 Vac.
  • Page 23: Starting The E5063A

    Normal operation is confirmed by the self-test if no error message appears. Turning the Power OFF Step 1. To turn OFF the power of the E5063A, first, press this standby switch or send a shutdown command from the external controller to activate the shutdown process (the process of software and hardware necessary to turn OFF the power supply).
  • Page 24: Disconnection From Supply Source

    Disconnection from Supply Source The power supply of the E5063A is cut off by disconnecting the plug of the power cable (on either AC outlet side or E5063A side). When it is necessary to disconnect the power supply in order to avoid shock hazards, etc., pull out the...
  • Page 25 “Ensuring Adequate Free Space around Analyzer for Immediate Disconnection of Power Cable in Case of Emergency” on page When turning the power OFF under normal circumstances, always follow the methods described in “Turning the Power OFF” on page Keysight E5063A Network Analyzer...
  • Page 26: Initial Registration Of E5063A

    Initial Registration of E5063A Initial Registration of E5063A When you start up the E5063A for the first time, you need to perform the initial registration of the Windows operating system of the E5063A. When the Windows agreement message box appears, click Agree. The rest of the procedure runs automatically.
  • Page 27: Troubleshooting

    Keysight E5063A Network Analyzer Installation Guide Troubleshooting This chapter describes the troubleshooting process during start up and the procedure of the operating system (OS) recovery when the Windows OS has been damaged. Troubleshooting during Startup When you encounter problems during start up, see Table 2-1.
  • Page 28: System Recovery

    Step 2. Disconnect all of the USB device from the USB ports. Step 3. Connect the keyboard to the E5063A. Step 4. Press the standby switch of the E5063A to turn it on. *. The default setting of the hard disk is recovered during the system recovery. For the hard disk that had failed earlier and had been replaced (after purchase), its default setting may not be the same as the factory state.
  • Page 29 Image Recovery System and press [Enter]. Figure 2-1 Instrument Image Recovery System selection screen Step 6. In the Keysight Software End User License Agreement dialog box, select the Agree button. Step 7. Type 2 to select Recover the original factory system image option and press [Enter].
  • Page 30 Step 11. After the restart, execute initial registration. For information on the execution procedure, refer to “Initial Registration of E5063A” on page Never turn off the power during the system recovery because doing so may cause serious damage to the E5063A. Keysight E5063A Network Analyzer...
  • Page 31 System Recovery how to install the handle how to execute the factory recovery types of system recoveries handle kit how to install the handle Initial registration inspection checking the shipment option Option 1CM Option 1CN Option 1CP Keysight E5063A Installation Guide...
  • Page 32 Index Keysight E5063A Installation Guide...
  • Page 33 This information is subject to change without notice. © Keysight Technologies 2013-2017 Edition 1, December 2017 *E5063-90010* E5063-90010 www.keysight.com...

This manual is also suitable for:

E5061b

Table of Contents