Lcd Replacement; Tools Required; Removal Procedure - Keysight E5071C ENA Service Manual

Network analyzers
Hide thumbs Also See for E5071C ENA:
Table of Contents

Advertisement

Replacement Procedure

LCD Replacement

LCD Replacement

Tools Required

Removal Procedure

Refer to
Step 1. Remove the outer cover as described in
Step 2. Remove the front panel as described in
Step 3. Remove the front panel cover as described in
page
Step 4. Remove the inverter board as described in
page
Step 5. Release the clamped cables from the clamps (item 1) on the LCD.
Step 6. Disconnect the cable (item 2) from the probe power.
Step 7. Remove the two TORX T10 screws (item 3) fastening the probe power and lift
it (item 4).
Step 8. Remove the two TORX T15 screws (item 5) fastening the LCD to the front
panel.
Step 9. Disconnect the cable (item 6) from the front panel keyboard.
274
TORX screwdriver, T10, T15, and T20
Flat edge screwdriver
Figure 6-41
for this procedure.
270.
272.
"Outer Cover Removal" on page
"Front Panel Removal" on page
"Front Panel Cover Removal" on
"Inverter Board Replacement" on
Keysight E5071C ENA Network Analyzers
203.
204.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents