Post-Repair Procedures - Keysight P937 A Series Service Manual

Streamline usb vector network analyzers
Table of Contents

Advertisement

Removal and Replacement Procedures

Post-Repair Procedures

Post-Repair Procedures
After the replacement of an assembly, you must perform the service
procedures in the order listed in
Table 5-1
Related Service Procedures
Replaced Assembly
A1 Ingot Chassis
A2 Module Assembly
A3 Front Panel
Assembly
Connector
Keysight P937xA PXIe Service Guide
Table
5-1.
Adjustment, etc.
No adjustment needed
No adjustment needed
No adjustment needed
No adjustment needed
TME Tests or Other Procedures
Perform the OF Ingot Utilities
Operator's check
All TME based tests that apply
Perform the OF Ingot Utilities
Operator's check
All TME based tests that apply
Operator's check
Operator's check
All TME based tests that apply
73

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

P9370aP9372aP9373aP9374aP9375aP9371a

Table of Contents