5. Carefully push additional 5/8-inch OD stainless steel tubing
through the roof flange and then drop into the tubing union on top
of the heater.
6. Any exposed 5/8-inch OD stainless steel tubing should be insulated
with additional pipe insulation inside the shelter.
7. Sleeve any additional water tight capping over the tubing that now
extends above the roof line.
8. Sleeve the white Delrin plastic tripod adapter over the 5/8-inch OD
tubing to an appropriate height to accommodate the tripod and
ambient T/RH sensor assembly. Tighten this adapter against the
stainless steel tubing using the two setscrews.
9. Sleeve the tripod over the tripod adapter to a proper height and
tighten. Using the adjustable legs of the tripod, plumb the inlet tube
assembly.
10. Attach the white ambient T/RH sensor radiation shield assembly
onto a portion of the exposed tripod adapter.
11. Place the PM
or PM
10
(all burrs should have been removed during installation).
12. Feed one end of the 25-foot T/RH cable trough the roof flange
assembly and connect to the bottom of the ambient T/RH assembly.
13. Connect the other end of the T/RH cable to the back of the
instrument (RH Temp).
14. Attach the heater power connectors to CHA HEATER/ CHB
HEATER.
Figure 2–6. Rear Panel Plumbing Schematic
inlet into the 5/8-inch stainless steel tubing