Chapter 2 Installation; Packaging And Transport - Thermo Scientific 5028i Instruction Manual

Continuous particulate monitor
Table of Contents

Advertisement

Packaging and
Transport
Thermo Fisher Scientific
Chapter 2
Installation
The following installation procedures for the Model 5028i describes
packaging, lifting the instrument, unpacking the instrument, setup and
installation, including the sample tube and pump, and attaching the
analog and/or digital outputs to a recording device. The installation
should always be followed by instrument calibration as described in the
"Calibration" chapter of this manual.
This chapter provides the following recommendations and procedures
for installing the instrument:
"Packaging and
Transport" on page
l
"Lifting" on page
l
"Unpacking and
Inspection" on page
l
"Acceptance Testing and Startup
l
"Setup" on page
2-7
l
"Connecting External
l
"Startup" on page
l
"Data
Content" on page
l
"Shutdown" on page
l
"Important
Tips" on page
l
The Model 5028i instrument, power cord, and operator manual
are shipped in an ISTA-3E-certified packaging and all other items/
accessories are shipped separately. The ISTA-3E-certified packaging
is comprised of the instrument within an inner box which is
secured within an outer box using foam and corner bracing. In
this configuration, the packaging is ready for shipping by carrier
domestically and internationally.
2-1
2-2
2-2
Procedures" on page
Devices" on page
2-17
2-18
2-18
2-18
2-2
2-12
Model 5028i Instruction Manual
2-1

Advertisement

Table of Contents
loading

Table of Contents