Installing the 19" Controlling Chassis

1.
Ensure the chassis is powered down.
WARNING
2.
Align the GCD-CP10 blade with the Slot 1 guides of the Controlling
Chassis.
Figure 3-3 19" Controlling Chassis – Guides Slot 1
3.
Slide the GCD-CP10 blade into the chassis until resistance (back
plane) is felt.

Figure 3-4 Installing the GCD-CP10 Blade

4.
Gently push until the blade seats. Tighten the two retaining screws on
front of the blade.

Figure 3-5 GCD-CP10 Blade Installed

Do not remove or install blades with the power on.