Installation; Led Indications; Figure 4-25 Pri Layout For Nt-1 Network - NEC Univerge SV9100 System Hardware Manual

Hide thumbs Also See for Univerge SV9100:
Table of Contents

Advertisement

Figure 4-25 PRI Layout for NT-1 Network

4-70
5.6.2

Installation

To install the GCD-PRTA:
1.
Plug the GCD-PRTA into any universal slot in the chassis.
2.
Use Program 10-51-01 (PRI/T1/E1) to set the GCD-PRTA blade to
either PRI or T1 or E1.
NOTE
3.
Connect the cable from the NT1 Network Termination cable to the
CN2 connector on the GCD-PRTA.
Network
NOTE
5.6.3

LED Indications

With normal operation, LED 1 flashes green.
is a cabling diagram.)
The NT1 connects to the network through an 8-pin
RJ-45/RJ48C connector. Use either the RJ48C
plug-to-RJ48C plug, which ships with the CSU or an
RJ-45/48C plug-to RJ-45/48C plug straight through
or CAT5 cable to connect the T1 to the CSU. (Refer
to
Table 4-32 GCD-PRTA RJ48C Connector Pin-
outs on page
4-73.)
With PRI Networking, a crossover cable must be
used on the master system PRI/T1/E1 blade or
NT1to the telco demarcation. If the systems are
networked side by side and not through telco, a
straight-through cable is used.
Issue 2.0
Figure 4-25 PRI Layout for NT-1
Installing the SV9100 Blades

Advertisement

Table of Contents
loading

Table of Contents