7-52
9.
Assemble the legs and bracket then align with tab holes (refer to
Figure 7-54 Align Bracket with
Figure 7-54 Align Bracket with Terminal
10.
Pass the LAN and DC power cables through the bracket (refer to
Figure 7-55 Pass Cabling Through
Figure 7-55 Pass Cabling Through Bracket
Terminal).
Bracket).
Installing SV9100 Optional Equipment
Issue 2.0