Issue 2.0
SV9100 System Hardware Manual
14.
Remove the connector cover (rubber) from the bottom of the multiline
terminal.
Figure 6-8 Removing the Connector Cover
15.
Insert the lower claws of the Bottom Unit (see
Bottom
Unit) into precut holes on the multiline terminal.
Figure 6-9 Installing the Bottom Unit
16.
Align connector on inside of bottom unit and push down until unit
snaps into place.
17.
Push the latch to release the cover (see
Bottom Unit
Cable). Stow the extra bottom unit connecting cable and
close the cover.
Figure 6-9 Installing the
Figure 6-10 Stowing the
6-9