Figure 3-9 Gpz-Bs10 Blade Guides; Figure 3-10 Installing Gpz-Bs10 Blade In Expansion Bay - NEC Univerge SV9100 System Hardware Manual

Hide thumbs Also See for Univerge SV9100:
Table of Contents

Advertisement

3-12
5.
Align the GPZ-BS10 blade with the guides located in the
expansion bay.

Figure 3-9 GPZ-BS10 Blade Guides

6.
Slide the GPZ-BS10 blade into the chassis until resistance
(back plane) is felt.

Figure 3-10 Installing GPZ-BS10 Blade in Expansion Bay

7.
Gently push until the blade seats and install the supplied
retaining screw.
8.
Align the door tabs with hinges and reattach the cover (refer
to
Figure 3-11 GPZ-BS10 Blade Installed on page
Issue 2.0
3-13).
Installing the SV9100 Chassis

Advertisement

Table of Contents
loading

Table of Contents