Installation; Battery Installation And Removal; Figure 4-8 Gcd-Cp10 Battery Installation - NEC Univerge SV9100 System Hardware Manual

Hide thumbs Also See for Univerge SV9100:
Table of Contents

Advertisement

Issue 2.0
SV9100 System Hardware Manual
3.1.2

Installation

Each SV9100 system must have the GCD-CP10 installed in Slot 1 of the
Controlling Chassis.
CAUTION
3.1.2.1

Battery Installation and Removal

Battery Installation
WARNING
1.

Figure 4-8 GCD-CP10 Battery Installation

IMPORTANT CONSIDERATIONS
The chassis power must be off when installing or removing
the GCD-CP10.
After removing a previously installed GCD-CP10, handle
the blade, carefully, from the edges. If certain solder points/
resistors are touched on the back of the blade, some RAM/
temporary memory may be lost (e.g., time, date, user-defined
settings, etc.)
Do not remove the CPU chip installed on the GCD-CP10
blade.
Keep away from open flame. Avoid excessive
heat.
Verify polarity (+, -) when installing battery.
Do not short the electrodes (+, -) with metals
such as wire.
Do not puncture, crush or solder the battery.
Install the battery (CR2032 3.0V coin-type lithium battery)
onto the GCD-CP10. The polarity + symbol must be on top
as illustrated in
Figure 4-8 GCD-CP10 Battery
Installation.
4-19

Advertisement

Table of Contents
loading

Table of Contents