Installation; Switch Settings - NEC Univerge SV9100 System Hardware Manual

Hide thumbs Also See for Univerge SV9100:
Table of Contents

Advertisement

4-88
Basic Support Package
Each blade installed with the PVA PMS accounts for up to 16 Extension
Ports of the Total Port capacity (One PVA PMS blade maximum). Each
CCISoIP package can be licensed for up to 24 ports and counts towards
total trunk port capacity.
Refer to the following tables for maximum upgrade capacities of the
GCD-PVAA blade:
Table 2-6 SV9100 Maximum 9.5" Gateway and 19" System
Capacities – Blades on page 2-12
Table 2-7 SV9100 Maximum 9.5" Base and Expansion System
Capacities – Blades on page 2-14
6.2.2

Installation

To install the GCD-PVAA:
Install CompactFlash on GCD-PVAA
Plug the blade into any universal slot on the chassis
Refer to Program 10-55-01 to configure the IP Address of the
GCD-PVAA
Refer to Program 10-55-04 to configure the Subnet Mask of the
GCD-PVAA
Refer to Program 10-55-05 to configure the Gateway of the
GCD-PVAA
The GCD-PVAA blade is hot swappable and can be removed from
the chassis without powering down the blade or the SV9100 system
When the SV9100 requires system reset, this blade comes back on
line
6.2.3

Switch Settings

The GCD-PVAA blade has the following switches:
Reset Switch SW3
This switch allows the technician to reset the GCD-PVAA without
having to remove and reinsert the blade into the chassis.