Issue 2.0
SV9100 System Hardware Manual
7.
Plug ribbon cable on back of 8LKI (LD)-L UNIT into
connector (metal side down) until pressure is felt.
8.
Press down on the black bar to lock the cable into place
(refer to
Figure 5-93 Ribbon Cable Installed
9.
Align the projections on the bottom of the 8LKI (LD)-L UNIT
with the guide holes on top of the multiline terminal (refer to
Figure 5-93 Ribbon Cable Installed on page
10.
Slide the 8LKI (LD)-L UNIT toward the keypad buttons until
snug (refer to
Figure 5-93 Ribbon Cable
Guide
Guide
Figure 5-94 8LKI (LD)-L UNIT
Figure 5-94 8LKI (LD)-L UNIT Installed
Installed).
Projection
(One Each Side)
5-89).
Installed).
5-89