3-66
4.
Install the four screws previously removed.
Figure 3-80 Install Screws (Small Batt Box)
5.
Align the brackets with the holes on the sides of the 9.5 inch
Basic Chassis (CHS2UG B). Install 2 M4 x 14 screws.
Figure 3-81 Wall Mount – Upper Side (Small Batt Box)
Issue 2.0
Installing the SV9100 Chassis