3-36
EXAMPLE:
0 CHS2UG (19" Chassis) & 4 CHS2UG B/CHS2UG E (9.5"
Base Chassis/9.5" Expansion Chassis)
1 CHS2UG (19" Chassis) & 3 CHS2UG B/CHS2UG E (9.5"
Base Chassis/9.5" Expansion Chassis)
2 CHS2UG (19" Chassis) & 2 CHS2UG B/CHS2UG E (9.5"
Base Chassis/9.5" Expansion Chassis)
3 CHS2UG (19" Chassis) & 1 CHS2UG B/CHS2UG E (9.5"
Base Chassis/9.5" Expansion Chassis)
4 CHS2UG (19" Chassis) & 0 CHS2UG B/CHS2UG E (9.5"
Base Chassis/9.5" Expansion Chassis)
3.
3.5.3
Installing Grounding on 9.5" Base and Expansion Chassis
1.
Ensure the 9.5" chassis is powered off and the AC power cord is
unplugged.
2.
Ground the chassis [refer to
connecting a 14 AWG wire from the FG lug on the back side of the
chassis to an electrical service ground (Connect to grounding
conductor (Less than 10 ohms)).
The CHS2UG E (9.5" expansion chassis) does not have an FG
lug.
Figure 3-45 9.5" Chassis (Rear View)
For External Battery
(12V Connection)
Repeat for additional Expansion Chassis.
Figure 3-45 9.5" Chassis (Rear
Ground
Issue 2.0
View)] by
CHS2UG
AC Inlet
Installing the SV9100 Chassis