NEC Univerge SV9100 System Hardware Manual page 7

Hide thumbs Also See for Univerge SV9100:
Table of Contents

Advertisement

2.4
2.5
2.6
Section 3
Installing the Chassis .............................................................................. 3-5
3.1
3.2
3.3
3.4
3.5
System Hardware Manual
Constructing the Main Distribution Frame (MDF)............................ 3-3
Power Failure Transfer.................................................................... 3-4
Fax CO Branch Connection ............................................................ 3-5
Unpacking the Equipment ............................................................... 3-5
Before Installation............................................................................ 3-5
Installing the 19" (CHS2UG) Chassis.............................................. 3-6
3.3.1 Installing the 19" Controlling Chassis............................................. 3-8
3.3.2.1
3.3.2.2
trolling Chassis .......................................................................3-10
3.3.2.3
Chassis ...................................................................................3-13
3.3.2.4
3.3.3 Install Grounding on 19" Chassis................................................. 3-19
3.3.5 Install AC Power Cords on 19" Chassis....................................... 3-20
3.3.7 Install Additional Blades 19" Chassis........................................... 3-21
3.3.8 Apply Power to the 19" Chassis................................................... 3-21
Chassis.......................................................................................... 3-22
Chassis.......................................................................................... 3-24
3.5.1
(Optional) ..................................................................................... 3-29
3.5.2.1
Issue 2.0
iii

Advertisement

Table of Contents
loading

Table of Contents