Chrysler Conquest 1988 Service Manual page 109

Engine, chassis, body. volume-1
Hide thumbs Also See for Conquest 1988:
Table of Contents

Advertisement

BODY
- Sunroof
23-81
18E24L
mm
(in.)
mm(in.)
18E245
18Y391
SERVICE
POINTS
OF INSTALLATION
26. INSTALLATION
OF ROOF LID FEMALE
HINGE ASSEM-
BLY
(1) For installation,
insert front drain pipe from above, and
rear drain pipe from
below.
(2) After installing the roof lid female
hinge assembly,
apply
the specified
sealant
to illustrated
screw
heads.
Specified
sealant:
MOPAR
Vinyl-Acrylic
Sealant
Part
Number
4026043
or
equivalent
8.
INSTALLATION
OF ROOF LID REGULATOR
ASSEMBLY
With
the roof lid fully closed,
check
to ensure
that the
regulator
knob marks
are in alignment.
4.
INSTALLATION
OF ROOF LID GLASS
(1) Before installing
the headlining,
perform
a water test by
following
procedure.
@ Fully close the roof
lid.
@ Spray water
against
the seam between
the roof lid
and roof all around.
Hold the hose and roof about
_
300 mm (11.8 in.) from the roof and spray water
for
more
than
five minutes.
NOTE
Adjust
the water
pressure
so that the height
of water
sprayed
will be about
500 mm (19.7 in.) as shown
in
illustration.
@ Check
for water
leaks in the passenger
compart-
ment.
@ If water
leaks are evident,
refer to troubleshooting
and correct.
(2) If there
are no leaks after the water
test,
remove
the
regulator,
retainer
and
latch
catch
and
install
the
headlining.
(3) Reinstall
the regulator,
retainer
and latch catch.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents