Final Actions - BeaconMedaes MedPlus TotalAlert Operation And Maintenance

Alarm network
Table of Contents

Advertisement

Final Actions

1. Complete the required preventive maintenance procedures. See "Preventive
Maintenance" on page 6-30.
2. Return all equipment to normal operating condition.
a. Connect any disconnected wires and connectors.
b. Close all panels.
c. Remove all tools and test equipment.
3. Complete all required administrative tasks.
MedPlus TotalAlert® Alarm Network Operation and Maintenance Manual (205728)
Chapter 2: Troubleshooting Procedures

Final Actions

2
Page 2-7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents