This section details how to lift the manipulator using lifting slings.
Equipment
Sling line for manipulator
Sling line for control cable
Illustration
xx0200000084
1
2
3
How to lift the manipulator
3HAC027400-001 Revision: K
Sling line for manipulator
Sling line for manipulator
Sling line for control cable
1 Adjust the manipulator to lifting position according to the illustration.
2 Put one sling line around each leg on the lower arm (positions 1 and 2).
3 Use another sling line to secure the lifting of the control cable (position 3).
© Copyright 2004-2013 ABB. All rights reserved.
2 Installation and commissioning
2.3.1 Lifting the manipulator with lifting slings
Note
Length: 2 m. Load: 500 kg.