Installing The Cards; Installing A Dsp Daughterboard - Avaya 1000 Installation And Commissioning Manual

Branch office
Hide thumbs Also See for 1000:
Table of Contents

Advertisement

Table 19: Exit program
****

Installing the cards

The following sections describe the process required to install the Gateway Controller and Server
cards.
Removing the SSC card
1. Unlatch the SSC card.
2. Remove the SSC card from its slot.
Important:
The SSC card should be preserved for a minimum of five days.
It is illegal to continue to run the system software on the existing SSC card. Please
DESTROY or RETURN the SSC dongle to your local Avaya Repairs/Returns center. No
further orders will be accepted for the serial number since it will be decommissioned and
tracked in Avaya's database.

Installing a DSP Daughterboard

Table 10 lists the configuration options for Position 1 and 2.
Table 20: DSP Daughterboard configurations
Position 1
DB-32 (card slot 11)
None
DB-32 (card slot 11)
DB-96 (card slot 11, 12, and13)
DB-96 (card slot 11, 12, and 13)
DB-128 (card slot 11, 12, 13 and 14)
Important:
Due to historical TN mapping for the Call Server software, even though the DSP channels will
occupy Card 0 in the MG 1000Es, the TN (l s c u) 000 0 00 00, (that is, unit 0 of card 0 in the
first Media Gateway) <supl sh> = 000 0) is not available.
A single channel (unit 0) is not available on the first Media Gateway only if there is a 32 port DB
installed in daughterboard position #2. If there is a 96 port DB installed in daughterboard
June 2014
Exit program
Position 2
None
DB-32 (card slot 0)
DB-32 (card slot 0)
None
DB-32 (card slot 0)
DB-128 (card slot 0, 9., 10 and 15)
Branch Office Installation and Commissioning
Comments? infodev@avaya.com
Upgrading the MG 1000B hardware
121

Advertisement

Table of Contents
loading

Table of Contents