MG 1000B platform hardware installation
The MG 1000B platform must have a Signaling Server. The CP PM or CP DC Signaling Server can
be installed in the following card slots:
• Chassis NTDU14 slots 1-4
• Chassis NTDK91 slots 1-3
• Cabinet NTAK11 slots 1-10
• MG 1010 NTC310 slots 22-23

Readiness checklist

Before starting the installation, use the checklist in
make sure you are ready.
Table 15: Readiness checklist
Have you:
Read all safety instructions in Avaya Communication Server 1000E: Installation and Configuration,
NN43041-310?
Received all equipment?
Made sure the area meets all environmental requirements?
Checked for all power requirements?
Checked for correct grounding facilities?
Developed an equipment layout plan for the system? This information is provided by your Planning
and Engineering group.
Completed the card slot assignment plan? This information is provided by your Planning and
Engineering group.
Obtained all the tools required to continue with the installation?
Prepared the network data as suggested in Avaya Converging the Data Network with VoIP
Fundamentals, NN43001-260 and Avaya Communication Server 1000E Installation and
Commissioning, NN43041-310?

Tools checklist

To install the system correctly, make sure that the tools listed in
page 114 are available before assembling the components.
Table 16: Tools checklist
Tools and components
screwdrivers
Branch Office Installation and Commissioning
114
Table 15: Readiness checklist