MG 1000B platform hardware installation
Figure 26: MG 1000B installed in a rack
7. Install the equipment ground wires for the MG 1000B and Signaling Server. See Avaya
Communication Server 1000E: Installation and Configuration , NN43041-310.
8. Install a UPS (if required) according to the manufacturer's instructions.
9. In the MG 1000B do the following:
a. If using an card as the Gateway Controller, install the DSP software daughterboards on
the card.
b. Install the Gateway Controller into the chassis.
c. Install the security dongle on the Server card.
d. For the CP PM card, ensure the S5 dip switch to position 0.
e. Install the Server card in the chassis.
f. Install the Signaling Server hardware
• If you are using a CP PM Signaling Server, set the S5 switch to position 1 and install
card in chassis.
• If you are using a commercial off-the-shelf (COTS) Signaling Server, rack-mount the
Signaling Server as per the vendor's directions.
10. Install circuit cards in the MG 1000B. See Avaya Communication Server 1000E: Installation
and Configuration , NN43041-310.
11. Make the Ethernet connections. Configure the Ethernet port to enable Element Manager
connectivity as required.
a. See
Connecting the Ethernet ports
Do not connect a serial port to the AUX connector. It can damage the port.
12. Set DIP switches on the power supply for the desired ringing voltage, ringing frequency, and
message waiting voltage. These procedures are in Avaya Communication Server 1000E
Installation and Commissioning, NN43041-310.
13. Connect the system to an AC power source. Make sure that the source matches the label on
the back of the MG 1000B. Turn the power switch to "ON".
Branch Office Installation and Commissioning
118
on page 146.