Chapter 4: Server installation and
System Platform is installed on either the Avaya S8510 Server or the Avaya S8800 Server.
Servers are installed in customer-provided racks and connected to the customer's network.
The server installation process includes:
• attaching rails to the rack
• installing the server to the rails
• connecting the server to a power supply
• connecting the server to the customer network.
See Installing and connecting the S8510 Server and Installing and connecting the S8800
Server topics for more information.

Installing and connecting the S8510 Server

Server installation checklist

#
1
Verify that all equipment is on site Compare the list of items that were ordered
2
Verify that rack is installed to
code
3
Verify that rack is grounded per
local code
4
Remove cabinet doors, if
necessary
Installing and Configuring Avaya Aura
connectivity
Task
System Platform
Notes
to the contents of the boxes. Use the
inventory list provided by your project
manager; do not rely on the packing slips
inside the boxes for the correct information.
See Approved Grounds (555–245–772),
available at http://support.avaya.com.
See cabinet manufacturer's
documentation.
April 2010
25