Installing The Server In The Rack - Avaya S8800 Manual

Hide thumbs Also See for S8800:
Table of Contents

Advertisement

4. Lift up the front of the server (2). See the preceding figure.
5. Pull the server out of the rack (3). See the preceding figure.

Installing the server in the rack

Procedure
1. Pull the slide rails forward until they click, two times, into place. See 1 in
2. Carefully lift the server and tilt it into position over the slide rails so that the rear nail
3. Slide the server down until the rear nail heads slip into the two rear slots.
4. Slowly lower the front of the server until the other nail heads slip into the other slots
5. Make sure that the front latch slides over the nail heads. See 5 in
6. Lift the locking levers on the slide rails. See 6 in
Maintaining the Avaya S8800 Server for Avaya Aura
heads on the server line up with the rear slots on the slide rails. See 2 and 3 in
Figure
1.
on the slide rails. See 4 in
Figure
1.
®
Communication Manager
Replace the Avaya S8800 Server
Figure
Figure
2.
July 2012
Figure
1.
1.
15

Advertisement

Table of Contents
loading

Table of Contents