Port Troubleshooting - Planet WGSW-52040 Configuration Manual

48-port 10/100/1000base-t + 4-port 100/1000x sfp managed switch
Hide thumbs Also See for WGSW-52040:
Table of Contents

Advertisement

Switch2:
Switch2(config)#interface ethernet 1/9
Switch2(Config-If-Ethernet1/9)#speed-duplex force100-full
Switch2(Config-If-Ethernet1/9)#exit
Switch2(config)#interface ethernet 1/10
Switch2(Config-If-Ethernet1/10)#speed-duplex force1g-full
Switch2(Config-If-Ethernet1/10)#exit
Switch2(config)#monitor session 1 source interface ethernet 1/8;1/9
Switch2(config)#monitor session 1 destination interface ethernet 1/10
Switch3:
Switch3(config)#interface ethernet 1/12
Switch3(Config-If-Ethernet1/12)#speed-duplex force100-full
Switch3(Config-If-Ethernet1/12)#exit

7.4 Port Troubleshooting

Here are some situations that frequently occurs in port configuration and the advised solutions:
Two connected fiber interfaces won't link up if one interface is set to auto-negotiation but
the other to forced speed/duplex. This is determined by IEEE 802.3.
The following combinations are not recommended: enabling traffic control as well as
setting multicast limiting for the same port; setting broadcast, multicast and unknown
destination unicast control as well as port bandwidth limiting for the same port. If such
combinations are set, the port throughput may fall below the expected performance.
7-12

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents