Planet WGSW-52040 Configuration Manual page 157

48-port 10/100/1000base-t + 4-port 100/1000x sfp managed switch
Hide thumbs Also See for WGSW-52040:
Table of Contents

Advertisement

PC1 connects to the interface Ethernet 1/7 of SwitchB, PC2 connects to the interface Ethernet
1/9 of SwitchB, Ethernet 1/10 of SwitchA connect to Ethernet 1/10 of SwitchB.
It is required that PC1 and PC2 can not mutually access due to reason of the security, but PC1
and PC2 can access other network resources through the gateway SwitchA. We can
implement this status through Hybrid port.
Configuration items are as follows:
Port
Port 1/10 of Switch A
Port 1/10 of Switch B
Port 1/7 of Switch B
Port 1/9 of Switch B
The configuration steps are listed below:
Switch A:
internet
Switch A
Switch B
PC1
Fiugre 20-3: Typical Application of Hybrid Port
Type
Access
10
Hybrid
10
Hybrid
7
Hybrid
9
20-79
PC2
PVID
the VLANs are allowed to pass
Allow the packets of VLAN 10 to pass
with untag method.
Allow the packets of VLAN 7, 9, 10 to
pass with untag method.
Allow the packets of VLAN 7, 10 to pass
with untag method.
Allow the packets of VLAN 9, 10 to pass
with untag method.

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents