Concluding Steps - Fujitsu PRIMERGY RX300 S7 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY RX300 S7:
Table of Contents

Advertisement

Processors
Figure 156: Closing socket release lever 1
Ê Close the socket release lever marked Open 1st (1) and latch it under the
load plate retention tab (2).
Ê If applicable, install the second processor accordingly.

11.2.4 Concluding steps

Perform the following procedures:
"Installing processor heat sinks" on page 325
Ê
"Installing the air duct" on page 74
Ê
"Mounting the server cover" on page 76
Ê
"Sliding the server into the rack" on page 80
Ê
If the server has been completely removed from the rack for maintenance
purposes, reinstall and secure it in the rack as described in section
"Mounting the server cover" on page
Ê Reconnect all external cables.
300
Upgrade and Maintenance Manual
76.
RX300 S7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents